
Stranded LHD Ship “Juan Carlos I” at Navantia Puerto Real for Propulsion System Adjustment
The LHD ship “Juan Carlos I” (L-61) is currently stranded in the large dry dock of Navantia Puerto Real to carry out a technical intervention on its propulsion system. The work, which will take place over four weeks, aims to adjust and optimize the two pods installed during the modernization carried out in 2025.
The Navy has planned to apply a design improvement developed in collaboration with ABB Marine & Ports to increase the “technological resilience” of the platform.
The work focuses on introducing an update to the system installed in 2025, a solution that, according to the Navy, is already being standardized on other ships equipped with the same system.
During its stay in the dry dock, Navantia will also carry out complementary work on habitability and equipment replacement. The immobilization is expected to last until the end of October, at which point the ship must regain its availability to face its upcoming operational schedule.
Photo: provided


