
Orange Stores Submarine Fiber Optic Cable in Tenerife
The cable ship “Pierre de Fermat” has docked at the port of Santa Cruz de Tenerife to unload submarine fiber optic cable, which will supply the western African coast. This is the result of the interest from the company Wind and the shipping agent Alfaship, which has a concession for a depot in the Dársena de Los Llanos of the Tenerife port, where it will store the fiber until 2021. On this occasion, the client has been Orange.
Photo: Ports of Tenerife


