
The “ODN Tay IV” Platform Awaits Docking at the Port of Tenerife
Being towed by the tugboat “APL Winger”, the oil platform “ODN Tay IV” is currently outside the port limits of Santa Cruz de Tenerife, where it will soon enter to undergo wintering and carry out maintenance and repairs. Flagged in the Marshall Islands, the platform is owned by a new client in these waters, Odebrecht Oil & Gas. It was built in Asia, dates back to 1999, and entered service in 2012 after modernization works.
This is a platform supported by eight columns, measuring 123.44 m in length, 60.96 m in width, and 18.28 m in draft, capable of drilling to a maximum depth of 9,100 m. It has an operational displacement of 45,643 tons and a propulsion capacity formed by thirteen engines totaling 8.18 Mw, which drive eight azimuth thrusters, four Rolls Royce, and four Wärtsila.
Photos: Fernando Salvador Sánchez-Caro



