
The ferry “Salamanca” breaks down on its first trip to Bilbao
The new ferry “Salamanca” from Brittany Ferries set sail this weekend from the port of Portsmouth on its way to Bilbao, with over 600 passengers on board. The British press highlights that “it is the first ferry in the UK that runs on liquefied natural gas (LNG), instead of the usual heavy fuel, which is much more polluting,” although it is not confirmed that it is using LNG on this trip due to the high cost of this type of fuel.
“However, the vessel suffered a technical problem yesterday that has left it stranded at sea,” emphasizes the digital edition of The News, although in reality, according to Brittany Ferries, the breakdown occurred on Saturday afternoon while in the port of Bilbao. This caused a delay of about 24 hours, until its departure yesterday evening at 8 PM, and it is expected to arrive tonight in Portsmouth, a day late from the scheduled time.
Photo: Brittany Ferries


