
The trimaran effect of Baleària Canarias will arrive this summer at the triangle between Los Cristianos, La Gomera, and La Palma
If forecasts hold true, by June 15, Baleària will have under its control the trimaran “Pepita Castellví” (IMO 9551363), which is the high-speed vessel acquired two months ago in France and is currently undergoing a complete interior renovation, engine and system checks, and being painted with its new corporate image in Cernaval, Cádiz.
Upon its relaunch, the trimaran “Pepita Castellví” will cover some of the Strait routes to ensure everything works as expected before heading to the Canary Islands, to join the line connecting Los Cristianos with La Gomera and La Palma.
“We cannot fail,” emphasizes Baleària's president, Adolfo Utor, in conversation with the director of puentedemando.com. “Before it goes to the Canary Islands, we need to thoroughly test the trimaran. It has to be an extremely reliable and very comfortable ship, with premium service that excites and restores confidence to the passengers of La Gomera and La Palma.”
“I am aware of what is happening on both lines. This will come to an end. We are preparing a significant battery of initiatives and I assure you there will be a before and after,” Utor comments, without providing further details.
Launched in 2015 and named in honor of the renowned Catalan scientist Pepita Castellví, it measures 102 m in length and 27 m in width, has a capacity for 870 passengers and 250 vehicles, in addition to 190 linear meters for cargo, and can reach a speed of 35 knots.
Photo: Nelson Bourne for puentedemando.com


